• Departments
  • About Fayette
  • Employment
  • A-Z Site Map
  • Search
  • Home
  • QUICK LINKS
    • Pay Water Bill
    • Get Car Tag
    • Adopt a Pet
    • Find Recycling Center
    • Download a Form
    • Apply for a Job
    • Check Restaurant Ratings
    • View Agendas/Minutes
    • Pay Property Taxes
  • SERVICES
    • Extension Office/4-H
    • Health Department
    • Solid Waste/Recycling
    • Utilities
    • Schools
    • Floodplain Information
    • More Services
  • PLANNING
    • Building Permits/Inspections
    • Development Ordinances
    • Zoning Applications
    • Zoning Ordinances
    • Golf Carts
    • Mobile Home
    • Subdivision
    • Transportation Plan
    • More Planning/Zoning
  • FINANCE
    • Budget/Financial Report
    • Bids and Proposals
    • Bidders List Application
  • PERMITS
    • Alcoholic Beverage License
    • Assembly/Parade Permit
    • Birth/Death/Marriage Certificates
    • Burn/Blasting Permit
    • Business License/Occupational Tax
    • Building Permits
    • Drivers License
    • Firearms License
    • Land Disturbance Permit
    • Motor Vehicle/Auto Tag
    • Passport
    • More Permit/License
  • ADMINISTRATION
    • Board of Commissioners
    • County Administrator

Stormwater Management Mainpage

Erosion & Sediment Control

GSWCC (Georgia Soil & Water Conservation Commission)

Green Book *

Field Manual *

E&SC Training & Certification

E&SCP Checklists (.xls)

Stand Alone NPDES Permit *

Common Development NPDES Permit *

Infrastructure NPDES Permit *

GAEPD (Georgia Environmental Protection Division)

Primary NOI (.doc)

Secondary NOI (.doc)

Tertiary NOI (.doc)

NOT (Notice of Termination) (.doc)

Land Disturbance Fees Form (.doc)

Determine State Waters *

Article IX.  Soil Erosion and Sedimentation Control Ordinance *

Building or Renovating a Pond in Georgia – A Pond Guide for Citizen *s

Pond Guide for Georgia Landowners *

Residential Inspection Packet *

Fertilizer & Grassing Rates *


* Users must have Adobe Acrobat Reader® installed on their computer to view or print this file.This is a free download available through Adobe.

Land Disturbance Permit Requirements

SEDIMENT IS THE ONE OF THE UNITED STATES LARGEST POLLUTANTS. HELP STOP IT BEFORE IT REACHES OUR STREAMS!

Effective February 27, 2004

Fayette County’s Soil Erosion and Sedimentation Control Ordinance was revised to comply with Federal and State mandated changes. Incorporation of the changes is required to retain the County’s certification as a “Local Issuing Authority”. Key provisions of the new ordinance are as follows:

Erosion and Sediment Control Plan (ESCP) Requirements

An approved Erosion and Sediment Control Plan is required for all projects that meet one of the following criteria:

A. Has a disturbed area greater than or equal to 1.0 acres, rounded to the nearest 1/10th
B. Is part of a larger common development (i.e., a subdivision);

The Stormwater Management Department will have 14 days to review the ESCP. A master ESCP, inclusive of all building lots, is required for all new subdivisions. This will alleviate the need for lot-specific plans within these developments.

Disturbed Acre Fee

Permit applicants shall pay the County a fee of $40 per acre of land disturbed and pay the State Environmental Protection Division a fee of $40 per acre of land disturbed. The proposed disturbed area shall be provided by the applicant on the ESCP and rounded to the nearest 1/10th acre. Fees will not be prorated below $40.

Please contact the Fayette County Stormwater Management Department for additional information 770-305-5410.

If you see an Erosion or Sediment Control problem please contact Fayette County Stormwater Management Department @ 770-305-5410 or stormwater@fayettecountyga.gov